Capacity Cost Recovery Amount
Capacity Cost Recovery Amount. Means, with respect to MC-Facility Contract Capacity in excess of 1100 MW, the product of (i) the difference in Dispatch of such 1 capacity between the Hypothetical System Dispatch and the Actual Dispatch and (ii) the difference between the PPA Option 2 Dispatch Price and VEP.