GENERATING UNIT FORCED OUTAGE HOUR. For any hour in which a Steam Generating Unit failed, due to reasons attributable to the Operator, for a continuous period of thirty (30) minutes to deliver net output measured using PNOC-EDC electrical meters at MP5 and MP4 at a level of at least ninety five percent (95%) of the STEAM GENERATING UNIT CONTRACTED CAPACITY, one third (1/3) of such hour shall be considered as a FORCED OUTAGE HOUR defined in ... the ECA. If the failure to meet at least 95% of STEAM GENERATING UNIT CONTRACTED CAPACITY is attributable to failure of PNOC-EDC to supply and/or make available 102% of 507.933 tonnes per hour (main steam flow) at a pressure of not less than 10 kg/cm(2) g, such hour shall be considered a No Fault Outage for such steam generating unit. View More Arrow